EPIC Charter School Parking Lot
We worked with the Architect and Owner to prepare the improvements for their new facility. BWRDG provided the civil site engineering, site grading, utility, parking and detention pond design. The new building was a mixed-use facility of office and industrial space. Due to the limited parcel of land, a creative site plan and detention pond was needed to meet the City requirements and the Owners desires. This project required coordination with the City of Oklahoma City for the site plan, detention and utility approval.
IMPROVING LIFESTYLES IN OUR COMMUNITY BY ENGINEERING THE BUILT ENVIRONMENT
BWRDG provided the civil site engineering, parking lot layout, site grading, detention pond design and drainage improvements. This project included the design of a new shared parking lot and sidewalks to serve the EPIC Charter
School facility and Rose State College sports fields.
BWRDG was contracted under the general contractor to complete a Design Build housing addition and roadway project. The project included working with the Contractor, Tribe and City to create a Preliminary and Final Plat for the new Friendship House. BWRDG completed the civil engineering design for the new roadway, sidewalk, storm sewer and detention pond design.
BWR DESIGN GROUP. LLC
University of Oklahoma Student Housing
Oklahoma Civil Engineering and more
Absentee Shawnee Housing Authority Friendship House
BWRDG provided the civil site engineering, re-grading, and design improvement to the surface drainage system. This project also included a rain harvesting collection system. The harvesting design included several underground storage tanks and pipe system to collect rainwater and reuse to irrigate the new ball field.
BWRDG provided the civil engineering and utility design for an emergency 27” sanitary sewer line repair project. The existing sanitary sewer main had been damaged during recent floods and required new piping, pipe anchors, emergency by-pass, creek grading and rip-rap amor to protect the sewer main from future damage. We worked with the City Engineer and staff to prepare the design documents, attend the pre-bid and bid opening. Our involvement continued during construction to observe the work, review pay applications and provide site observation as well as record drawings at the completion of the project
BWRDG provided the civil site engineering, site grading, utility, parking and drainage improvements for the new mixed-use office and medical building. The project required coordination with the City of Warr Acres for the building and site approval, the City of Oklahoma City for the fire supply line and utility connections, and the Oklahoma Department of Transportation for the driveway access and permitting. Also, a complete drainage review was completed to verify the finish floor elevation adjacent to the exiting body of water (FEMA Floodplain) near the site.
Haynes Equipment Company
BWRDG was hired to provide enhanced construction administration service during the construction of the University of Oklahoma Student Housing project on the south side of campus. We reviewed the completed civil engineering documents, provided value engineering services, designed necessary field adjustments, provided routine site observation visits, approved shop drawings, material submittal reviews, and attended weekly construction meetings. BWRDG worked closely with Architect, Contractor and Owner in a collaborative method to ensure the civil site constriction stayed on schedule.
RECENT PROJECTS
BWRDG provided the civil site engineering, site grading, utility, parking and drainage improvements for the new coffee shop. The project required coordination with the City of Oklahoma City for the site plan, drainage and utility approval.
Absentee Shawnee Housing Authority Little Axe
Chickasaw Bricktown Ballpark Field Replacement
NW & MAC Professional Building
City of Duncan 27” Sewer Main
BWRDG was contracted under the general contractor to complete a Design Build housing addition roadway project. The project included working with the Contractor, Tribe and ODOT to create a new roadway to serve the new neighborhood. BWRDG completed the civil engineering design for the new roadway, drainage ditches, RCB creek crossing and coordination with the US Army COE for a Nationwide Creek Crossing permit.
Stella Nova